Skip to main content
WhatsApp Email Instagram Facebook
South Bastar Mineral & Cultural Centre

Rooftop Solar Power for Dantewada, Kirandul & Bacheli

High-reliability solar EPC for residences, hospitals, educational ashrams, and mining ancillary facilities across South Bastar.

5.05 kWh/m²/day
Daily Solar Irradiance
300+ Sunny Days/Year
Annual Sunny Days
₹78,000
Max Central Subsidy (DBT)
CSPDCL Jagdalpur Circle (Dantewada Division)
CSPDCL Discom Jurisdiction
🏠

Residential Rooftop Solar & Subsidies in Dantewada (South Bastar)

Residences across Dantewada, Geedam, and mining colonies benefit from rooftop solar that buffers against grid volatility while availing ₹78,000 direct PM Surya Ghar subsidy.

System Capacity Central Subsidy (Govt) Monthly Generation Annual Savings
1 kW Rooftop ₹30,000 120 – 145 Units ₹9,000 – ₹12,000
2 kW Rooftop ₹60,000 240 – 290 Units ₹18,000 – ₹24,000
3 kW Rooftop (Most Popular) ₹78,000 (Max Cap) 360 – 435 Units ₹30,000 – ₹38,000
5 kW to 10 kW ₹78,000 600 – 1,300 Units ₹55,000 – ₹1,10,000

* Subsidies are credited directly to the consumer’s Aadhaar-linked bank account via DBT upon CSPDCL commissioning.

🏭

Commercial & Industrial Solar EPC in Dantewada (South Bastar)

Institutions, workshops, and commercial facilities in South Bastar cut energy overheads and achieve continuous power with hybrid and grid-tied solar systems.

40% Accelerated Depreciation (Sec 32)
Substantially offset corporate income tax liabilities within Year 1 of commissioning.
TOD Metering Tariff Hedging
Shield operations against peak tariff hikes with 3.2 to 4-year project payback.

5-Step CSPDCL Net-Metering Process in Dantewada (South Bastar)

1
Site Technical Feasibility
Detailed shadow trajectory study and engineering CAD layout for your roof.
2
National Portal & Discom Application
Submitting TFR approval request with local CSPDCL divisional office.
3
Engineering & Solar Installation
Deploying DCR TopCon bifacial modules, HDG 80-micron steel, and dual chemical earthing.
4
Joint Inspection & Net Meter Sync
CSPDCL official testing and replacement of standard meter with bidirectional meter.
5
Commissioning & Direct Subsidy Transfer
Generating commissioning certificate and direct DBT subsidy credit within 21–30 days.

Frequently Asked Questions (Dantewada (South Bastar))

Does Synergineers install solar in Kirandul and Bacheli?
Yes. As a Bastar-based EPC company, we routinely deploy and service residential and commercial solar installations throughout Kirandul, Bacheli, and Geedam.

Need a Solar Site Survey in Dantewada (South Bastar)?

Our senior electrical engineers will conduct an on-site feasibility study and generate a custom 3D shadow analysis report.

+91 91316 45811 Request Site Visit Online

Key Areas Served in Dantewada (South Bastar)

Dantewada City Kirandul (Bailadila) Bacheli Geedam Commercial Market Kuakonda Katekalyan

Get in Touch